Glenferrie Oval Sewer Rectification Works

Plumbtrax Infrastructure Services were engaged by Boroondara Council to rectify the collapsed boundary sewer at 5m depth, the works involved:
  • confined space entry
  • deep excavation works
  • shoring
  • traffic & pedestrian management
  • live sewer works
  • dewatering management & implementation
  • contaminated spoil removal
  • backfilling & compaction requirements
  • emergency works management & implementation

Drainage Improvements

Dandenong Rd East Stormwater Drainage Implementation Strategy

Sadie St Mt Waverley Drainage Improvements

Plumbtrax Infrastructure Services were Contracted by Monash City Council to manage & construct a new Easement Drain from Sadie St Mt Waverley, through Private property & connecting into Scotchmans Creek, This project was undertaken to minimise overland Stormwater flows at the bottom of Sadie St, which was causing significant flooding into nearby properties. The works comprised of:
  • Pipeline construction 150mm- 750mm Dia
  • Pit Construction
  • Demolition works
  • Traffic Management Co-ordination with the Public & Private owners
  • Re-instatement works to driveways, parks & roadways
  • Working around existing services “High Risk” works
  • Implementation of Environmental Management Strategies
Drainage Melbourne Contractors

Ringwood Lake Erosion Rectification Works

Plumbtrax Infrastructure Services were engaged by Maroondah City Council to carry out erosion rectification works at Ringwood Lake, the works comprised of the following:
  • De-silting & de-watering of waterways, creeks & streams
  • Detailed rock beaching & rock placing works
  • Concrete Construction works
  • Vegetation removal & Vegetation re-generation areas
  • Construction of Gabion Rock retaining walls
  • Construction of drainage lines & new pit construction
  • Traffic & Pedestrian Management
The new works have improved stream flows into Ringwood Lake, & stopped erosion on the upper bank holding the Carpark behind Daisys Hotel.

Summit Drv Bulleen

Plumbtrax Infrastructure Services were engaged by Manningham City Council for the major construction of a Stormwater Detention System within the Road Reserve in Summit Drv Bulleen, the works comprised the following:
  • Major Traffic Management implementation, Pedestrian Management & partial road closures
  • Design & Construction of custom pre-cast culvert systems, sealed & acting as the Detention System, each module weighing in at 2tonne
  • Construction of Triple & Double Grated Side Entry Pits to Manningham Standards
  • Construction & diversion of concrete drainage lines 150mm- 450mm
  • Bulk Excavation works for Detention System
  • Concrete Construction, Kerb & Channel
  • Re-instatement of Road Pavement, Compaction & testing
The new works have improved storm water flooding to adjacent properties, due to the existing easement drain being undersized & inaccessible for upgrade, storm water flows are retained in the new detention system and slowly released into the out fall drain.

 

Power St Croydon Nth

Plumbtrax Infrastructure Services were engaged by Maroondah City Council for the construction of a new Stormwater Drainage easement through the Melbourne Water (Croydon North Pipe Track), These works were to eliminate Stormwater overflow into neighbouring properties, Due to the existing system being undersized and unable to cope, The works comprised of the following:
  • Major Traffic Management implementation, Pedestrian Management & partial road closures
  • Construction of grated & junction pits, 1m- 4m depths
  • Works involving live storm water assets
  • Construction of drainage lines 300mm- 525mm concrete pipes
  • Re-instatement to Melbourne Water Reserves & Private Property
  • Re-instatement of Road Pavement
  • Working in & around Existing live services
  • CCTV Surveys of Existing drainage system before & after

 

Norwood F C

Plumbtrax Infrastructure Services were engaged by Maroondah City Council for the construction of a new Stormwater Drainage Easement for Councils new Norwood FC Sporting Pavillion upgrade, A new Stormwater Easement was required to be constructed so that the Pavillions Stormwater system from the Building & Carpark areas could discharge from site into the Mullum Mullum creek, The works comprised the following:
  • Major Traffic Management implementation, Pedestrian Management & partial road closures
  • Construction of grated & junction pits, 1m- 4m depths
  • Works involving live storm water assets
  • Construction of drainage lines 300mm- 525mm concrete pipes
  • Re-instatement to Reserves & Private Property
  • Re-instatement of Road Pavement
  • Working in & around Existing live services
  • Detailed rock beaching & rock placing
  • Rock hammering & rock removal

 

Soak Pits

Plumbtrax Infrastructure Services were engaged by Mornington Peninsula Shire Council for the Construction of new Stormwater Outfall Soakage Pits, Due to the Peninsulas difficulty of storm water draining away, Soak pits have to be installed in most suburban areas in order to drain away outfall storm water from Private Property & Council Roads, The works comprised the following:
  • Major Traffic Management implementation, Pedestrian Management & partial road closures
  • Construction of grated & junction pits, 1m- 4m depths
  • Works involving live storm water assets
  • Construction of drainage lines 300mm- 450mm concrete pipes
  • Re-instatement to Reserves & Private Property
  • Re-instatement of Road Pavement
  • Working in & around Existing live services
  • Detailed rock beaching & rock placing
  • Rock hammering & rock removal

 

Gross Pollutant Trap

Plumbtrax Infrastructure Services were engaged by Maroondah City Council for the construction of a new Gross Pollutant Trap within Councils Depot for a new Wash Down Bay, This system is to eliminate any oils, debris & rubbish from entering into the Stormwater System, The works comprised the following:
  • Major Traffic Management implementation, Pedestrian Management & partial road closures
  • Construction of grated & junction pits, 1m- 4m depths
  • Works involving live storm water assets
  • Construction of drainage lines 300mm- 450mm concrete pipes
  • Re-instatement to Reserves & Private Property
  • Re-instatement of Road Pavement
  • Working in & around Existing live services
  • Detailed rock beaching & rock placing
  • Rock hammering & rock removal